Plant | Goal | Target | Status |
---|---|---|---|
Jorge Lacerda Thermoelectric Complex | Reduce solid wastes, effluents and emissions. | Reach, by the end of 2016, particulate material emission indices below 0.4 kg/MWh. | |
Jorge Lacerda Thermoelectric Complex | Reduce solid wastes, effluents and emissions. | Adapt the coal stockyards by March 2015. | |
Jorge Lacerda Thermoelectric Complex | Ensure the units’ operating licensing. | Implement the particulate material characterization project by 2016 to quantify the Complex’s influence on the region’s air quality. | |
Jorge Lacerda Thermoelectric Complex | Reduce solid wastes, effluents and emissions. | Upgrade the environmental monitoring network by the end of 2014 for automated data transmission to the environmental agency. | |
Jorge Lacerda Thermoelectric Complex | Reduce solid wastes, effluents and emissions. | Install a wind barrier to reduce drag of particulate material in the first half of 2015. | |
Jorge Lacerda Thermoelectric Complex | Improve community relations. | Build the Environmental Monitoring Center in 2015 to expand the disclosure of the environmental indicators. | |
Jorge Lacerda Thermoelectric Complex | Act effectively in environmental recovery and preservation actions in the area of influence. | Contribute to the recovery of the metropolitan area (former fines basin), by burning coal fines and sending the ashes to a landfill by December 2016. | |
Jorge Lacerda Thermoelectric Complex | Promote sustainable development projects. | Build the wind power project by the end of 2017. | |
Jorge Lacerda Thermoelectric Complex | Promote sustainable development projects. | Build the photovoltaic plant project by the end of 2015. | |
Jorge Lacerda Thermoelectric Complex | Reduce solid wastes, effluents and emissions. | Recover at least 90% of total disposed waste (not including ashes) by the end of 2014. | |
Jorge Lacerda Thermoelectric Complex | Improve energy efficiency and reduce emissions. | Increase the Complex’s energy efficiency by 16% by reducing CO2 emissions by 16% by 2017, using 2012 as benchmark year. | |
Jorge Lacerda Thermoelectric Complex | Improve community relations. | Reach a rate lower than 50% in terms of environmental problem perception in the region as allegedly caused by the Complex by 2017. | |
Lages Cogeneration Unit | Be effectively involved in the Canoas River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
Lages Cogeneration Unit | Reduce solid wastes, effluents, emissions, and the consumption of chemicals. | Reduce by 2% the consumption of chemicals used in regenerations compared to 2013 by December 2016. | |
Lages Cogeneration Unit | Donate seedlings. | Distribute 1,000 seedlings for plantation in the region by the end of 2014. | |
Cana Brava Hydroelectric Power Plant | Be effectively involved in the Tocantins River basin preservation actions. | Permanently control illegal ground occupancy in the reservoir islands and banks. | |
Cana Brava Hydroelectric Power Plant | Be effectively involved in the Tocantins River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
Cana Brava Hydroelectric Power Plant | Reduce waste and wastewater generated. | In 2014 reuse a volume 10% higher compared to 2013. | |
Cana Brava Hydroelectric Power Plant | Reduce waste and wastewater generated. | In 2014 consume no more than the past two years’ average volume (2012 and 2013). | |
Cana Brava Hydroelectric Power Plant | Improve community relations. | In 2014-2016 reach an annual increase of 5% in the number of people hosted by the Visits and Environmental Education Program. | |
Cana Brava Hydroelectric Power Plant | Prioritize the use of renewable fuel in own and rented vehicles. | Replace 35% of the gasoline consumed by own and rented vehicles for ethanol by January 2016. | |
Cana Brava Hydroelectric Power Plant | Act effectively in environmental recovery and preservation actions in the area of influence. | Support the recovery project of 45 springs in the Minaçu municipality by December 2016. | |
Cana Brava Hydroelectric Power Plant | Act effectively in environmental recovery and preservation actions in the area of influence. | Production of 30,000 seedlings of Cerrado native trees and donation of 16,000 native trees in 2014. | |
Estreito Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce average annual waste by 5% by 2016 (calculated based on the 2013, 2014 and 2015 inventories). | |
Estreito Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce to 50% of the legal standard the oil and grease concentration in effluents by January 2016. | |
Estreito Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce by 5% average annual consumption of treated water by 2016. | |
Itá Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Attend at least 50% of the regular meetings set in the annual calendar of the Jacutinga Committee. | |
Itá Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Donate at least 10,000 seedlings by December 2014. | |
Itá Hydroelectric Power Plant | Mitigate and compensate for the environmental impacts caused by the reservoir formation and project operation. | Recover the right and left banks upstream of Spillage 1 by December 2014. | Not met due to the June 2014 flood. |
Itá Hydroelectric Power Plant | Mitigate and compensate for the environmental impacts caused by the reservoir formation and project operation. | Implement the Mata do Rio Uruguai Teixeira Soares Natural Park by December 2014. | Postponed to 2015. |
Itá Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce by 5% the average annual waste generation by 2016. | |
Itá Hydroelectric Power Plant | Prioritize the use of renewable fuel in own and rented vehicles. | Replace 35% of the gasoline consumed by own and rented vehicles for ethanol by January 35%. | |
Machadinho Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Hold a permanent seat in the hydrographic basin committees. | |
Machadinho Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Oversee permanently the use of water from and ground occupancy around the reservoir. | |
Machadinho Hydroelectric Power Plant | Mitigate the environmental impacts caused by the operation. | Implement fish fauna preservation actions by December 2014. | |
Passo Fundo Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Permanently control illegal ground occupancy in the reservoirs’ islands and banks. | |
Passo Fundo Hydroelectric Power Plant | Be effectively involved in the Uruguay River basin preservation actions. | Hold a permanent seat in the relevant hydrographic basin committees. | |
Ponte de Pedra Hydroelectric Power Plant | Be effectively involved in the Correntes River basin preservation actions. | Permanently control illegal ground occupancy in reservoir banks. | |
Ponte de Pedra Hydroelectric Power Plant | Be effectively involved in the Correntes River basin wildlife preservation actions. | Ensure the survival of at least 90% of the wildlife found in the intake canal. | |
Ponte de Pedra Hydroelectric Power Plant | Improve society relations. | Implement the Serra de Sonora State Park by December 2015. | |
Ponte de Pedra Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce to 50% of the legal standard the oil and grease concentration in effluents from 10% per year by January 2016. | |
Ponte de Pedra Hydroelectric Power Plant | Improve communication with society. | Receive 1,500 people by December 2015. | |
Ponte de Pedra Hydroelectric Power Plant | Be effectively involved in the Correntes River basin preservation actions. | Establish three partnerships for the protection/recovery of region’s springs and/or APPs by 2020. | |
Ponte de Pedra Hydroelectric Power Plant | Be involved in the mitigation actions of climate change-related impacts. | Reach a 53% ethanol consumption compared to total fuel consumed by own and rented vehicles by December 2020. | |
Ponte de Pedra Hydroelectric Power Plant | Be effectively involved in the Correntes River and Pantanal basin preservation actions. | Donation and/or plantation of 18,000 native tree seedlings by December 2014. | |
Ponte de Pedra Hydroelectric Power Plant | Reduce waste and wastewater generated. | Reduce by 2.5% the average annual waste generation by 2015. | |
Salto Osório Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
Salto Osório Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Release at least 10,000 fish fries native to the region in the plant’s reservoir by December 2014. | |
Salto Osório Hydroelectric Power Plant | Improve society relations. | Receive at least 3,500 visitors, involving schools, universities, associations, and other stakeholders by December 2014. | |
Salto Osório Hydroelectric Power Plant | Reduce waste and wastewater generated. | Recover at least 60% of total waste generated in the plant. | |
Salto Osório Hydroelectric Power Plant | Establish a harmonious relationship with the local community by becoming a partner in reservoir water and bank use aimed at improving environmental quality in the area. | Plant and donate 18,000 seedlings by December 2014. | |
Salto Osório Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Devise an effective control to avoid damage to fish fauna by conducting a specific study by December 2016. | |
Salto Osório Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Implement the recovery project of the former construction site by December 2018. | |
Salto Osório Hydroelectric Power Plant | Contribute to the application of a climate change policy. | Use only ethanol as the fuel of our car fleet by December 2014. | |
Salto Osório Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Implement controls to protect at least 400 springs in the bordering municipalities by December 2016. | |
Salto Osório Hydroelectric Power Plant | Improve society relations. | Involve 200 people annually in environmental awareness building actions in the bordering municipalities by December 2014. | 171 people. |
Salto Santiago Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
Salto Santiago Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Release at least 10,000 fish fries native to the region in the reservoir by December 2014. | |
Salto Santiago Hydroelectric Power Plant | Improve society relations. | Receive at least 3,900 visitors, involving schools, universities, associations, and other stakeholders by December 2015. | |
Salto Santiago Hydroelectric Power Plant | Reduce waste and wastewater generated. | Recovery of at least 70% of total waste generated in the plant by December 2015. | |
Salto Santiago Hydroelectric Power Plant | Establish a harmonious relationship with the local community by becoming a partner in reservoir water and bank use aimed at improving environmental quality in the area. | Plant and donate 25,000 seedlings by December 2015. | |
Salto Santiago Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Implement controls to protect at least 300 springs in the bordering municipalities by December 2015. | |
Salto Santiago Hydroelectric Power Plant | Be effectively involved in the Iguaçu River basin preservation actions. | Devise an effective control to avoid impacts on fish fauna by conducting a specific study by December 2016. | |
Salto Santiago Hydroelectric Power Plant | Contribute to the implementation of a climate change policy. | Use only ethanol as the fuel of our car fleet by December 2014. | |
Salto Santiago Hydroelectric Power Plant | Improve society relations. | Involve 300 people annually in environmental awareness building actions in the bordering municipalities by December 2015. | |
São Salvador Hydroelectric Power Plant | Be effectively involved in the Tocantins River basin preservation actions. | Permanently control illegal ground occupancy in the reservoir islands and banks. | |
São Salvador Hydroelectric Power Plant | Be effectively involved in the Tocantins River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
São Salvador Hydroelectric Power Plant | Improve community relations. | In 2014-2016 reach an annual increase of 5% in the number of people hosted by the Visits and Environmental Education Program. | |
São Salvador Hydroelectric Power Plant | Reduce waste and wastewater generated. | Implement by October 2015 a mechanism that allows the separation of water, oil, and grease in the effluents of the Transformers’ Water and Oil Draining and Separator System to reach no more than 50% of the legal standards, i.e., 10mg/l. | |
São Salvador Hydroelectric Power Plant | Prioritize the use of renewable fuel in own and rented vehicles. | Use at least 35% of renewable FUEL AND 50% of less pollutant fuel of total fuel consumed by our own and rented car fleet by December 2015. | |
Charqueadas Thermoelectric Power Plant | Be effectively involved in the Jacuí River basin preservation actions. | Participate in hydrographic basin committees in the area of influence. | |
Charqueadas Thermoelectric Power Plant | Build an ash and water separation tank. | Collect and filter rainwater from the yard by January 2015. | |
Charqueadas Thermoelectric Power Plant | Improve communication with the community. | Hold at least one environmental education event in the community’s schools by September 2015. | |
William Arjona Thermoelectric Power Plant | Biodiversity/environmental education. | In 2014, donate 300 seedlings to the community for environmental education, urban reforesting, or degraded area recovery purposes in the area of influence. | 200 seedlings. |
William Arjona Thermoelectric Power Plant | Improve society relations. | Hold at least one environmental education event in a community’s school by December 2014. | |
William Arjona Thermoelectric Power Plant | Improve society relations. | Host at least 300 visitors in 2014. |